Marina Safeway Tower Approved: What San Francisco's 848-Unit Waterfront Project Means for Buyers and Sellers (November 2026)
Hello, San Francisco neighbors. Today I want to talk about one of the biggest housing stories in the city this month: the plan to replace the Marina Safeway on the waterfront with a 22-story apartment building has received final approval from the San Francisco Planning Department, and the neighbors' federal lawsuit against it changed shape a few days later. Here is what happened, and what it can mean for people buying or selling in San Francisco.

What happened?
According to The San Francisco Standard (Nov. 8, 2026), the Planning Department gave final approval to a plan by developer Align Real Estate to raze the Marina Safeway and replace it with a 22-story, 848-unit apartment building on a waterfront site zoned for 40 feet.
Approval letter dated Nov. 6: planners said the project qualified for streamlined approval under Assembly Bill 2011, a 2022 state housing law that lets eligible projects skip a public hearing and environmental review. Approval under that law is ministerial: if a project meets the criteria, the city must approve it.
Why it can be 22 stories: by setting aside 86 units for low-income households, Align qualified for a 49.3% density bonus under California law, which allowed it to override the 40-foot height limit.
The grocery store stays: Safeway is planned to return on the ground floor with a 63,000-square-foot store, more than 20,000 square feet larger than the current one.
Next step: with planning approval in hand, Align can now apply for permits to demolish the store and excavate the site.
Zoning background: Mayor Daniel Lurie's Family Zoning Plan, which raised height limits across much of the city, kept this site at 40 feet. Before that rezoning took effect, Align filed a preliminary application under state law that locked in the rules then in place.
Then, on Nov. 13, 2026, The Standard reported that in an amended complaint filed Wednesday, Nov. 11, the neighbors and two advocacy groups suing in federal court removed Align, Safeway and parent company Albertsons as "real parties in interest." The city and PG&E (a former owner of the site) remain defendants, and the suit still asks the court to void the city's approval. Align says it sees this as allowing it to proceed with permitting and construction. The plaintiffs could still ask the court to block the city from issuing permits, but only by showing they are likely to win and would suffer irreparable harm. They also argue the 1959 Safeway building is a listed historical resource, which would disqualify it from AB 2011; the city's approval letter said the building was determined ineligible for the register in 2015 and in 2020.
What this means for buyers
First, keep the time frame realistic. This is an approval, not a construction start. Permits, demolition, excavation and a pending federal case all come before anyone moves in, so this project does not add homes to the market this winter or next spring. It is also an apartment (rental) project, so it does not directly add homes for sale.
Second, the bigger lesson is about how housing now gets approved in San Francisco. State laws such as AB 2011 and the state density bonus can allow much taller buildings on commercial sites than local zoning maps suggest. If you are buying near a shopping center, a grocery store, a parking lot or a commercial corridor, it is worth checking the planning pipeline around that address before you write an offer. Views, shade, parking and construction noise can change over a few years. Nothing here is good or bad by itself; you just want to know about it before you buy, not after.
What this means for sellers
If you own near a proposed or approved project, buyers and their agents are likely to ask about it. Know the basic facts (size, approval status, any lawsuit) and be ready to answer clearly. In California, sellers generally need to disclose known facts that could affect a buyer's decision, so talk with your agent, and if needed a real estate attorney, about what applies to your home.
Longer term, more housing near daily services like a full-size grocery store can add to the appeal of an area, but construction years can be disruptive. I would not try to time a sale around a single project with an uncertain timeline. Price your home on recent comparable sales and present it well.
My take
I have been helping Bay Area families buy and sell for 10 years, in Mandarin, Cantonese and English. For me, the Marina Safeway story is a clear example of state housing law shaping San Francisco's future supply, even where local zoning stays the same, and of how long the road from approval to move-in can be. If you are watching a home near a commercial site and want me to look at what has been filed nearby, I am happy to help. This is general market information, not legal or financial advice.
For a free consultation, reach out any time:
Search homes: brendonyim.exprealty.com
Call or text: 408.880.4191
Email: brendon.yim@gmail.com
Watch my weekly Bay Area market videos on YouTube: youtube.com/@BrendonYim - subscribe so you don't miss an update.
Brendon Yim | eXp Realty | DRE# 02080821 | 408.880.4191
Source: The San Francisco Standard, "Marina Safeway project wins final city approval despite neighborhood outrage," Nov. 8, 2026 (https://sfstandard.com/2026/11/08/san-francisco-marina-safeway-redevelopment-approved/); The San Francisco Standard, "Neighbors remove Marina Safeway developer from lawsuit, setting off a game of chicken," Nov. 13, 2026 (https://sfstandard.com/2026/11/13/marina-safeway-lawsuit-drops-align-real-estate/)




Comments